- Delivery and installation of a new Zaptec Go Black charger
- New 32A circuit/cable from the fuse box up to 15 meters
- Requires fuse box space, capacity and surge protection.
- 2 holes for cable at the installation address (up to 20cm thickness),
- Driving up to 50 km round trip from the nearest OneCo branch or partner
- Connection of the charger and commissioning
- Application to local grid owner for desired installation
- Documentation on Boligmappa.no
Notification to grid company regarding installation of EV charger - Charging cable T2-T2/3phase-32A/22kw (Package 2 only) is included in the package due to the Norwegian IT network and 230V, which will then provide 7.4kw on such a cable. With a 16A cable, customers will only get 3.6kw with 1 phase and is therefore not recommended.